Superior surfaces

Flake System

Floor preparation (Grinding + Repair)
1st – 100% Solid Epoxy (MVB Epoxy upgrade available)
2nd – 100% Solid Epoxy
3rd – Decorative Flake Broadcast)
4th – Polyaspartic Topcoat (UV resistant)

Solid System

Floor preparation (Grinding + Repair)
1st – 100% Solid Epoxy (MVB Epoxy upgrade available)
2nd – 100% Solid Epoxy
3rd – Optional Polyurethane Topcoat (UV resistant)

Metallic System

Floor preparation (Grinding + Repair)
1st – 100% Solid MVB Epoxy
2nd – 100% Solid Epoxy basecoat
3rd – Design Coat (Colours and Patterns)
4th – Polyurethane Topcoat (Matt or Glossy)

About us

KM Epoxy is a locally owned two-person team with over 12 years of combined industrial epoxy experience.

We specialize in residential garages, basements, and small commercial projects up to 2,000 sq. ft. Using industrial-grade materials trusted in aircraft hangars and manufacturing facilities, we deliver durable, professional-quality flooring at competitive prices. Because we operate with low overhead, we can often offer better value than larger residential epoxy companies.

If you receive a quote significantly lower than ours, it's worth asking what materials, numbers of layers, thickness of layers, preparation methods are being sacrificed to achieve that price. Our mission is simple: quality floors, honest pricing, and results that last.

BEFORE AND AFTER

FAQ

Will my epoxy floor be slippery?

It depends on the system and finish you choose.

Our flake systems naturally provide texture and better traction than smooth solid-color coatings. For customers who want additional slip resistance, we can add anti-slip additives to the topcoat on virtually any epoxy system without significantly affecting the appearance of the floor.

Whether it’s a garage, basement, workshop, or commercial space, we’ll recommend the right level of texture based on how the area will be used.

The timeline depends on the epoxy system and the size of the project.

For most flake and solid-color epoxy systems up to 2,000 sq. ft., installation typically takes 2-3 days from start to finish. This includes surface preparation, coating application, and topcoat installation.

Metallic epoxy floors can take longer because each project is unique. Installation time depends on the design complexity, artistic effects, and the number of coating layers required to achieve the desired look.

While curing times vary depending on temperature and humidity, most epoxy floors can be:

  • Walked on after 24-48 hours
  • Used for moving furniture or heavy items after 3-4 days
  • Fully returned to normal use once adequately cured

We’ll provide specific recommendations for your project based on the system installed and site conditions.

A properly installed epoxy floor can last for many years. Longevity depends on factors such as traffic, maintenance, and the coating system selected. We use industrial-grade materials and proper surface preparation to maximize durability and performance.

In most cases, yes. Small cracks and minor surface imperfections can often be repaired during preparation. However, active or structural cracks may require additional repairs. We’ll assess the condition of your concrete before recommending a system.

Yes. Epoxy floors are highly resistant to automotive fluids, road salt, oil, grease, and many household chemicals. This makes them an excellent choice for garages, workshops, and utility spaces.

Surface preparation is the most important part of any epoxy installation. Grinding the concrete properly allows the coating to bond to the surface and helps prevent peeling, chipping, or premature failure.

Not all epoxy systems are created equal. Price differences usually come down to surface preparation, coating thickness, material quality, and the number of coating layers being applied.

At KM Epoxy, we use industrial-grade materials and professional grinding equipment because we believe quality work pays off in the long run.

Maintenance is simple. Regular sweeping and occasional mopping with a mild cleaner is usually all that’s needed. Avoid harsh acidic cleaners and clean up spills promptly for best results.

Concrete may look dry on the surface, but it can contain moisture that continues to move through the slab over time. Excess moisture can create pressure beneath the coating, which may lead to bubbling, blistering, peeling, or coating failure.

At KM Epoxy, we don’t force customers to install a Moisture Vapor Barrier (MVB), and many projects perform well without one. We use 100% solids epoxy primer applied at a substantial thickness, which already provides excellent adhesion and moisture resistance.

However, whenever possible, we recommend installing an MVB regardless of the measured moisture content of the concrete. Moisture conditions can change over time, and a moisture barrier provides an extra layer of protection against future moisture-related issues.

For customers looking for the longest-lasting system and maximum peace of mind, an MVB is one of the best investments that can be made before applying an epoxy floor.

Talk to us

Have any questions? We are always open to talk about your new projects and how we can help you.
Scroll to Top